As we near completion of our Project, it’s a good time to post a few ‘Before & After’ photos. We have used some new and exciting eco products, top quality finishes and first class labour.
My blogs are sometimes a bit technical, I make no apology for that – far too often we are bombarded with Renovation Projects featuring new Kitchens, Bathrooms & Décor. Little attention being paid to the most important part of a renovation – the structure and fabric of the building:
- Roof
- Drainage & Guttering
- Insulation
- Services
- Windows and Doors
Before |
Without a sound and efficient structure, the rest has little long term merit, so that’s where we put most of our money and effort. However, we have also installed some great quality interior finishes too and my best bargain was the ex-display Alno kitchen – over £20k’s worth of kitchen with ‘Bling’ for less than £3k!
After: Bargain Ex-Display Alno Kitchen |
Before : Kitchen |
Before : Main Bathroom |
After: Main Bathroom |
After: Main Bathroom |
Some of the eco improvements are hidden:
- A Fully automated Rainwater Harvesting System under the balcony, halving our water bill.
- The 300mm insulation is well hidden too but the new efficient heating system is now turned off except for one radiator in the bathroom!
- The Solar hot water tank installed in the basement is awaiting the installation of Solar Panels on the South Elevation until then we are relying on our new ultra efficient system boiler – also installed in the basement.
Not quite finished yet - we will be installing some external insulation, cladding, more guttering and a couple of windows over the next 2-3 weeks and our Hyperactive Plasterer, Adrian is whizzing around on his stilts into the bedrooms today.
Previous episodes of this Renovation Project can be found here
Previous episodes of this Renovation Project can be found here